mirror of
https://github.com/seaweedfs/seaweedfs.git
synced 2026-09-20 13:30:46 +02:00
CP13-8 scenario results on m01/M02 (25Gbps RoCE): fsck_ext4: CLEAN file count: 200 (assert_equal PASS) checksum match: MATCH (assert_contains PASS) pgbench TPS: 565.69 (assert_greater PASS) auto-failover: 10.0.0.1:18480 → 10.0.0.3:18480 Code changes (tester + scenario): - volume_server_block.go: readiness state, assignment lifecycle cleanup - block_heartbeat_loop.go: readiness-aware heartbeat reporting - store_blockvol.go: readiness tracking - master_server_handlers_block.go: block API handler updates - cp13-8-real-workload-validation.yaml: redesigned scenario (removed block_promote, use natural auto-failover flow, bootstrap write before wait_volume_healthy) - testrunner/actions/devops.go: scenario action improvements - replica_read_test.go: component-level replica read test Phase docs: CP13-7 accepted, CP13-8/8A technical packs updated, design docs updated for protocol closure evidence. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
V2 Design
This directory now keeps the current design and process entrypoints for the active V2 line.
Historical planning/review documents were moved to ../docs/archive/design/ to keep this directory smaller and easier to navigate.
Read First
v2-protocol-truths.mdv2-protocol-claim-and-evidence.mdv2-product-completion-overview.mdv2-phase-development-plan.mdv2-semantic-methodology.zh.mdv2-protocol-closure-map.zh.mdv2-algorithm-overview.mdv2-algorithm-overview.zh.mdv2-detailed-algorithm.zh.md
Active Process / Workflow
protocol-development-process.mdagent_dev_process.md
Active Supporting Design
v2-acceptance-criteria.mdv2-open-questions.mdv2_scenarios.mdv2-scenario-sources-from-v1.mdv1-v15-v2-comparison.mdv2-reuse-replacement-boundary.mdwal-replication-v2.mdwal-replication-v2-state-machine.mdwal-replication-v2-orchestrator.mdwal-v2-tiny-prototype.mdwal-v1-to-v2-mapping.mdv2-dist-fsm.md
Historical / Archived
See ../docs/archive/design/README.md for archived:
- old roadmaps
- first-slice planning docs
- passed readiness/slicing reviews
- phase-specific design maps for closed phases
Execution Note
- active development tracking lives under
../.private/phase/ - current phase contract and slice packages live there rather than in this directory
The original project-level copies under learn/projects/sw-block/design/ remain as shared references for now.