3 changes for clearer dev roadmap:

1. v3-phase-15-mvp-scope-gates.md — added G9A Placement Controller MVP
   per architect direction 2026-04-26. Sits between G9 lifecycle and
   G10 snapshot. P0 priority. Source rationale: production block
   storage needs V2-like operational ergonomics (operator asks for
   intent → system computes placement → master mints assignment) but
   V3 authority discipline must be preserved (no heartbeat-as-
   authority, no V2 promote/demote). G9A bridges the two:
     - flat-topology RF placement (NO rack/AZ awareness in P15)
     - durable desired topology generation
     - explainable candidate filtering (why selected, why rejected)
     - replacement-on-drain/disk-loss
     - master mints ONLY from desired topology
   Explicit non-scope (defer to G20 / P16): rack-aware, hot rebalance,
   automatic load movement, multi-master HA, V2 promote/demote.
   Updated P0 table, dependency graph §4.5, closure rule §5 #13.

2. v3-dev-roadmap.md (NEW) — 1-page entry point for "where are we,
   what's next." Lists 22 P15 gates with status emoji, current
   batch state, naming decoder, source-of-truth pointers, recently
   closed batches, prediction for after-G5. QA owns; updates at
   every gate-close.

3. v3-phase-development-model.md — added §0 header note clarifying
   this is methodology-only, NOT current state. Points to
   v3-dev-roadmap.md as current-state entry. Methodology sections
   (§1-§6, §8-§14) remain canonical.

Doc layer architecture now:
  Methodology:  v3-phase-development-model.md (stable)
  Roadmap:      v3-dev-roadmap.md (entry point; updated per gate-close)
  Canonical:    v3-phase-15-mvp-scope-gates.md (22 gates + closure)
  Rationale:    v3-product-placement-authority-rationale.md (why G9A)

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 20:15:44 -07:00

51 KiB

V3 Phase Development Model

Date: 2026-04-11 (methodology stable; NOT current-state — see §0 below) Status: methodology reference; for current state see v3-dev-roadmap.md Purpose: define how V3 phases should be run so every phase has a clear target, a closed loop, and a visible path toward production scope

§0 Document scope (added 2026-04-26)

This doc is the methodology, NOT the current state. Sections describe the closed-loop discipline, target/proof/closure rules, and suggested phase shapes. Some illustrative examples (especially §7 "Suggested V3 Phases" and §15 "Production Roadmap Layer") were drafted Apr 2026 and may not match current reality.

For current state, go to:

Question Doc
What's done, what's next, where are we? v3-dev-roadmap.md
What does P15 promise (22 gates)? v3-phase-15-mvp-scope-gates.md
Why pre-declared topology + authority discipline? v3-product-placement-authority-rationale.md

This doc remains canonical for: (§1-§6) closed-loop discipline rules; (§8) anti-pattern closure mapping; (§9) phase-gates-must-stay-narrow rule; (§10-§14) repo bootstrap + naming conventions. These are methodology-stable.


1. Short Answer

Yes, V3 should use phase-based development.

In fact, V3 needs phase discipline even more than V2, because:

  1. V3 is trying to protect semantic cleanliness
  2. it is likely to reuse execution muscles that do not fully align
  3. it may later support multiple runtimes such as Go and Rust
  4. it must not quietly accumulate workaround semantics while "moving fast"

So the point of phases is not bureaucracy.

The point is:

  1. each phase must have one clear target
  2. each phase must define what it will not do
  3. each phase must define what counts as proof
  4. each phase must close its loop before the next phase expands scope

2. What A Closed Loop Means In V3

For V3, a phase is not closed when code exists.

A phase is closed only when all four are true:

  1. the semantic target is explicit
  2. sw implemented only that target
  3. tester validated the intended proof level
  4. the result was recorded in a durable phase decision/progress artifact

That means the loop is:

target
  -> implementation
  -> evidence
  -> review
  -> accepted closure

If one of these is missing, the phase is not closed.

3. Why V3 Needs Stronger Phase Rules Than V2

V2 had to discover many truths while implementation was already moving.

V3 has a different job:

  1. preserve the semantic lessons already learned
  2. prevent old route pollution from re-entering
  3. convert design package into a portable semantic platform

That means V3 phases should be stricter about:

  1. semantic scope
  2. non-goals
  3. evidence gates
  4. reuse boundaries

4. Phase Shape

Each V3 phase should contain three documents:

  1. phase-xx.md
  2. phase-xx-log.md
  3. phase-xx-decisions.md

This follows the earlier project process, but the content emphasis changes for V3.

4.1 phase-xx.md

Use for:

  1. current phase target
  2. current scope
  3. explicit non-goals
  4. accepted guardrails
  5. handoff expectations for sw and tester

It should stay short.

4.2 phase-xx-log.md

Use for:

  1. design evolution
  2. review corrections
  3. carry-forward items
  4. reuse notes from V2
  5. why a boundary moved or stayed fixed

It can be longer.

4.3 phase-xx-decisions.md

Use for:

  1. durable decisions
  2. gate decisions
  3. accepted compromises
  4. explicit "do not re-open without new evidence" items

This keeps V3 from re-arguing the same architecture boundary every week.

5. Required Fields For Every V3 Phase

Every phase should explicitly answer these questions.

5.1 Target

What single thing is this phase trying to establish?

Good examples:

  1. mini engine can execute deterministic conformance
  2. adapter-backed route can drive one real recovery family path
  3. selected V2 scenarios calibrate correctly under V3

Bad examples:

  1. improve architecture
  2. make V3 better
  3. support more stuff

5.2 Scope

What is included in this phase?

5.3 Non-goals

What is explicitly excluded in this phase?

This is critical for V3, because otherwise:

  1. storage extensions leak in early
  2. scheduler policy leaks into semantic core
  3. mismatched V2 muscles get imported "temporarily"

5.4 Reuse boundary

What may be reused from V2, and in what form?

Examples:

  1. reference only
  2. wrapper allowed
  3. copy allowed
  4. must rewrite in native V3 form

5.5 Required proof

What evidence level is required?

Examples:

  1. schema validation
  2. conformance runner
  3. adapter-backed calibration
  4. selected runner scenarios

5.6 Reject conditions

What makes this phase fail, even if code exists?

Examples:

  1. duplicate semantic route appears
  2. projection is reused as control input
  3. terminal success has multiple authorities
  4. adapter silently decides policy

5.7 Closure Checklist

Every phase should also answer three closure questions explicitly.

These are not optional review style points.

They are part of whether the phase is actually closed.

A. Semantic closure

Question:

Has the semantic route evolved far enough for this phase, with the required constraints complete and no hidden anti-pattern dependence?

Must check:

  1. the engine / adapter / accepted command boundary now covers the semantic target of this phase
  2. stale, reorder, overlap, timeout, cancel, and handoff behavior are fail-closed at the proof level required by this phase
  3. target meaning, lineage meaning, and terminal truth authority are still explicit and fixed
  4. no new surface quietly turns progress, projection, transport state, or policy hints into semantic truth
  5. relevant anti-patterns from protocol-anti-patterns.md are either:
    • already closed
    • explicitly bounded in this phase
    • or explicitly deferred to a named later phase

Short form:

the semantic contract needed by this phase is complete enough, and it does not quietly depend on timing luck or execution residue.

B. Functional closure

Question:

Does the new function introduced in this phase, including any V2 muscle migration, work cleanly and honestly at the intended boundary?

Must check:

  1. new behavior is inside the declared scope of the phase
  2. any migrated V2 execution muscle names what old semantic coupling was removed
  3. code path, docs, scope statement, and test/evidence story all describe the same capability
  4. integration behavior exists at the intended level, not only isolated local unit success
  5. the claimed feature has enough evidence to prevent "implemented but not actually closed" drift

Short form:

new function and migrated execution both land cleanly, and the evidence matches the real product/runtime claim.

C. Phase-responsibility closure

Question:

Is this work closed in the correct phase, rather than quietly borrowing authority from a later phase or leaving a current-phase obligation unresolved?

Must check:

  1. the work belongs to this phase's declared responsibility line
  2. this phase does not silently pull policy, topology authority, or product meaning backward from a later phase
  3. anything not closed here is explicitly assigned to a later named phase
  4. if a task or PR spans more than one responsibility line, the split or the phase definition should be re-reviewed

Short form:

the work is not only correct; it is closed at the correct layer and in the correct phase.

6. The V3 Phase Loop

Each phase should run through the same loop.

Step 1: Phase definition

Owner:

  1. manager / architect

Output:

  1. target
  2. scope
  3. non-goals
  4. gate

Step 2: Expectation definition

Owner:

  1. tester

Output:

  1. must-pass expectations
  2. failure-class checklist
  3. required test level
  4. reject conditions

Step 3: Implementation

Owner:

  1. sw

Output:

  1. code
  2. delivery template
  3. trace hooks
  4. reuse note

Step 4: Technical review

Owner:

  1. architect

Output:

  1. correctness review
  2. semantic-boundary review
  3. fail-closed review

Step 5: Evidence closure

Owner:

  1. tester

Output:

  1. runner/conformance evidence
  2. calibration closure
  3. reject-or-accept statement

Step 6: Durable closure

Owner:

  1. manager / architect

Output:

  1. phase decision
  2. carry-forward list
  3. next-phase handoff

7. Suggested V3 Phases

The exact numbering can change, but the semantic order should not.

Phase 0: Constitution Freeze

Target:

  1. freeze the initial V3 semantic package enough to begin implementation

Close when:

  1. truth domains are accepted
  2. mini engine unit is accepted
  3. metadata boundary is accepted
  4. growth plan and calibration plan exist

Phase 1: Initial Core

Target:

  1. executable deterministic mini engine

Close when:

  1. schema loads
  2. engine applies events deterministically
  3. conformance examples run
  4. stale rejection and projection derivation are reviewable

Phase 2: Reference Runtime

Target:

  1. a small replay/conformance runtime exists

Close when:

  1. conformance runner works
  2. traces are readable
  3. semantic outputs are replayable

Phase 3: First Adapter Route

Target:

  1. one real adapter-backed route exists from runtime facts to session close

Close when:

  1. no duplicate trigger path exists
  2. no duplicate terminal path exists
  3. adapter does not silently own policy

Phase 4: Runnable Block Sparrow

Target:

  1. one complete but narrow block slice can run end-to-end through the new core

Close when:

  1. one basic block route can be started and exercised end-to-end
  2. the route still uses one semantic decision path and one terminal-close path
  3. the slice is narrow, but it is complete enough to act as the first public runnable check-in
  4. phase output can honestly say "this repo runs a basic block slice"

Phase 5: Bootstrap And Validation Stabilization

Target:

  1. the runnable block sparrow becomes easy to start, inspect, and validate repeatedly

Close when:

  1. the repo has a minimal bootstrap and read-only inspection surface for the runnable slice
  2. the repo has a minimal test interface for validating the runnable slice
  3. first-time users can start, inspect, and troubleshoot the slice without reading deep design docs
  4. progress remains visible and honest in the standalone repo
  5. no real operator CLI is introduced before a later single-node demo stage

Phase 6: Calibration MVP

Target:

  1. selected V2 scenarios are calibrated through the runnable V3 route

Close when:

  1. chosen calibration scenarios pass
  2. semantic route matches observed runtime route
  3. tester closes the calibration evidence

Phase 7: Persistent Single-Node Slice

Target:

  1. admit one persistence-backed single-node block slice cleanly

Close when:

  1. one persistence-backed single-node slice survives stop/restart with data still present
  2. the persistence seam does not pollute the semantic core
  3. the result stays honest about proving local persistence rather than broader durability

Phase 8: Local Data Process

Target:

  1. admit one coherent local data process around the accepted persistence seam

Close when:

  1. local read/write/flush/checkpoint/recover responsibilities are explicit
  2. bounded abrupt-termination proof exists for the accepted crash model
  3. the local data process does not pollute the semantic core

Phase 9: Data Sync Process

Target:

  1. admit one coherent data-sync institution for catch-up and rebuild data movement

Close when:

  1. data movement, barrier, and achieved-frontier feedback responsibilities are explicit
  2. replication/rebuild data transfer no longer lives as scattered transport muscle
  3. the data-sync process does not decide recovery class or terminal truth

This phase is where the remaining data-plane closure work belongs:

  1. data-sync execution must be one named institution rather than scattered transport helpers
  2. byte movement, barrier, achieved-frontier, and restart/retry behavior must be explicit
  3. recovery traffic must stay lineage-bound and fail closed under stale or overlapping execution
  4. this phase closes data movement correctness, not topology governance

Practical sequencing rule:

  1. implementation of Phase 9 and Phase 10 may overlap
  2. declared closure must still treat Phase 9 as earlier, because Phase 10 timeout/cancel/lifecycle claims depend on Phase 9 wire correctness and lineage-safe feedback behavior

Phase 10: Recovery Execution Process

Target:

  1. admit one coherent recovery execution institution around engine-issued commands

Close when:

  1. catch-up and rebuild execution lifecycles are explicit
  2. engine-issued targets remain fixed through execution
  3. the execution process does not reinterpret command intent or publish terminal semantic truth by itself

This phase is where the remaining execution-side handoff closure belongs:

  1. command-to-execution-to-close lifecycle must be explicit for catch-up and rebuild
  2. old execution must become semantically dead immediately after newer lineage exists
  3. delayed callback, retry, timeout, cancellation, and overlap rules must be explicit and tested
  4. this phase closes recovery execution semantics, not promotion or failover policy

Phase 11: Single-Node Product Surface

Target:

  1. make the accepted single-node route operable as a bounded product surface

Close when:

  1. one operator-usable single-node workflow exists
  2. observability and safe inspection are strong enough for repeatable local operation
  3. the product surface still reads truth from accepted lower institutions rather than inventing a new authority path

This phase is where bounded single-node governance surfaces belong:

  1. local operator visibility, inspection, and safe action surfaces become explicit
  2. the repo should state clearly that current closure is recovery semantics on one node, not cluster topology governance
  3. any "promote" or "failover" wording must remain out of scope unless backed by later replicated-phase evidence
  4. Phase 11 surface must not expose cluster-shaped APIs that are likely to require breaking meaning changes when later topology phases land

Phase 12: Replicated Durable Slice

Target:

  1. admit one honest replicated durable slice around the accepted route

Close when:

  1. the replicated route supports bounded catch-up and rebuild with honest failover/rejoin behavior
  2. durability and fencing claims are backed by explicit evidence
  3. replicated execution still preserves the accepted semantic ownership split

This phase is the first phase that should close bounded failover behavior:

  1. reassignment, failover, rejoin, and fencing behavior become explicit replicated claims here
  2. the product may claim one bounded failover/rejoin contract only after explicit evidence exists here
  3. this phase still consumes topology facts from above; it does not yet own broad topology arbitration policy

Non-goals that must stay explicit:

  1. Phase 12 may consume epoch from an authority, but it must not mint or govern epoch itself
  2. Phase 12 may use a trivial test/manual authority as a placeholder
  3. Phase 12 does not choose which node becomes the new primary
  4. Phase 12 does not decide what condition should trigger a failover

Practical bounded-contract checklist:

  1. given (old primary, new primary, epoch+1), rejoin must converge without stale execution pollution
  2. acknowledged or rejected stale callbacks during epoch turnover must not contaminate current truth
  3. bounded failover/rejoin claims must name what is accepted
  4. bounded failover/rejoin claims must also name what remains outside this phase

Phase 13: Production Hardening And Release Gate

Target:

  1. close the mainline product hardening gate for the accepted replicated slice

Close when:

  1. qualification, observability, and release criteria are explicit
  2. the repo can state a bounded production-ready claim honestly
  3. the mainline can hand off to later scale and ecosystem phases without reopening core authority boundaries

This phase is where bounded first-launch governance closure belongs:

  1. bounded failover/publication/runbook criteria should be explicit
  2. operational disturbance handling must be clear enough for a bounded production-ready statement
  3. this is still not the phase for broad topology expansion or broad placement policy

Phase 14: Scale And Topology Expansion

Target:

  1. widen the accepted product into larger-scale and richer-topology deployment shapes

Close when:

  1. placement, rebalance, and failover behavior remain correct under the accepted expanded topology set
  2. scale/topology work reuses the accepted semantic and execution institutions rather than replacing them
  3. the resulting topology claims are backed by explicit evidence

This phase is where topology governance and richer failover policy belong:

  1. topology authority, placement, rebalance, and failover policy become explicit institutions here
  2. eligibility, selection, and topology-wide convergence policy should be closed here rather than hidden inside recovery execution
  3. only from this phase onward should the product claim richer topology behavior beyond the bounded replicated slice

Mainline product meaning:

  1. Phase 14 is not a side expansion line; it is the mainline stage where fuller topology/governance product closure should land
  2. if the repo wants to aim at a real full product rather than a bounded replicated slice, that aim must pass through Phase 14

Phase 15: Operations And Ecosystem Expansion

Target:

  1. complete the mainline product loop through operations and ecosystem integration

Close when:

  1. operator workflows, ecosystem entry points, and lifecycle operations are production-reviewable
  2. the ecosystem surface still preserves accepted truth boundaries
  3. the mainline product and operations story is complete enough to shift later work into expansion lines

This phase is where cluster-facing operator policy becomes consumable:

  1. operator workflows for failover, recovery supervision, and lifecycle control become explicit product surfaces here
  2. ecosystem entry points may expose topology/failover operations only after the lower topology-policy phases are already closed
  3. this phase makes the accepted governance and topology behavior operable; it does not invent new truth

Mainline product meaning:

  1. Phase 15 is where the mainline product loop becomes consumable through operations and ecosystem surfaces
  2. Phase 14 + Phase 15 together should be read as the intended full-product completion target for the mainline

8. Anti-Pattern Closure Mapping

V3 phases should explicitly track which anti-patterns are:

  1. already avoided in the semantic core
  2. only partially closed
  3. deferred until adapter/runtime phases

Reference:

  1. protocol-anti-patterns.md

8.1 A1: Heartbeat Timing Defines Recovery Semantics

Status:

  1. not fully closed in Phase 1-2

Reason:

  1. the semantic core already decides from bounded facts rather than timer values
  2. but the real closure requires a live adapter/runtime path where heartbeat, probe, and refresh can arrive in different timings

Closure phase:

  1. primary closure target: Phase 3
  2. calibration proof target: Phase 6

Required proof:

  1. heartbeat timing changes latency only
  2. it does not directly choose recovery class
  3. selected reconnect/rejoin scenarios prove this through the adapter-backed route

8.2 A4: Event Ordering Determines Semantics

Status:

  1. partially closed in Phase 1-2

Reason:

  1. the mini engine already rejects stale epoch/endpoint/session and uses bounded facts for decisions
  2. but full closure requires proof that runtime/adapter event ordering still converges to the same semantic result

Closure phase:

  1. semantic-core partial closure: Phase 1
  2. replay/runtime strengthening: Phase 2
  3. adapter/runtime closure: Phase 3
  4. calibration proof: Phase 6

Required proof:

  1. same facts produce the same commands/projection regardless of arrival ordering
  2. replay and adapter-backed scenario evidence agree

8.3 A7: Transport Mechanics Leak Into the Semantic Engine

Status:

  1. avoided in Phase 1-2 engine/runtime core
  2. not yet fully proven at integration boundary

Reason:

  1. the semantic reducer and reference runtime are intentionally transport-free
  2. but real closure requires attaching execution muscles without reintroducing transport state into semantic logic

Closure phase:

  1. engine/runtime avoidance: Phase 1-2
  2. integration closure: Phase 3
  3. calibration proof: Phase 6

Required proof:

  1. transport lifecycle stays in adapter/runtime
  2. engine only receives normalized facts
  3. no semantic rule depends on TCP/session plumbing details

8.4 Practical Rule

If a phase touches runtime integration and does not say how it preserves closure against A1, A4, and A7, then the phase definition is incomplete.

9. Phase Gates Must Stay Narrow

A common failure is letting one phase carry too much ambition.

For V3, phase gates should be narrow enough that failure is diagnosable.

Bad phase gate:

  1. "V3 MVP should support failover, rebuild, RF3, SmartWAL, and Rust readiness"

Good phase gate:

  1. "one adapter-backed route handles short-gap and long-gap recovery with one terminal-close authority"

Narrow gates are important because they make closure real.

10. Repo Bootstrap After Phase 4

Phase 4 should be treated as the first complete runnable sparrow, but a small repo bootstrap step should immediately follow its closure.

Purpose:

  1. turn the first runnable slice into a credible first public check-in
  2. freeze public-facing paths early so git history is not dominated by later renames
  3. make the repo operable by readers who did not follow the internal design history

Recommended immediate actions after Phase 4 closes:

  1. freeze the primary semantic path under core/
  2. add a minimal runnable entry path
  3. add minimal repo status and progress files
  4. prepare the bootstrap and validation stabilization work for Phase 5

Practical rule:

  1. Phase 4 proves the sparrow can run
  2. the immediate bootstrap step makes that sparrow visible and usable as the first stable repo shape

11. Testrunner Inside The Phase Model

The runner should be attached to phases explicitly.

Phases 1-2

Use:

  1. conformance runner

Phases 3-4

Use:

  1. calibration scenarios
  2. selected V2 scenario reuse

Phases 6-8

Use:

  1. broader SW system scenarios
  2. chaos / soak / workload validation as appropriate

This keeps the runner aligned with phase goals instead of becoming a giant undifferentiated pass/fail bucket.

12. Progress Exposure In The Future V3 Repo

Each phase should be visible in the standalone repo through:

  1. docs/progress/current-status.md
  2. docs/progress/phase-xx.md
  3. docs/progress/phase-xx-log.md
  4. docs/progress/phase-xx-decisions.md
  5. docs/conformance/status.md

For each phase, report:

  1. target
  2. current status
  3. evidence level reached
  4. open risks
  5. next gate

This progress surface is still necessary even when a broader production roadmap also exists.

13. Naming And Repo Structure Rule

For the future standalone repo, public-facing directory names should describe system role, not internal generation history.

Recommended top-level implementation names:

  1. core/
  2. runtime/
  3. adapter/
  4. conformance/
  5. schema/

Reason:

  1. the standalone repo is the first public implementation, not a public "V3 repo"
  2. outside readers should see stable subsystem names rather than internal rewrite history
  3. the semantic core is expected to grow into a fuller system rather than be replaced by another generation directory later

Current transition rule:

  1. after the runnable-sparrow closeout, the preferred public semantic-center path is core/
  2. any remaining v3mini/ references should be treated as historical or transitional, not as the preferred long-term public package name
  3. phase plans should refer to the semantic center as core when describing the intended standalone repo structure
  4. documents may still mention "v3mini" when referring to the already-built Phase 01-03 code or historical implementation path

Practical reading rule:

  1. core = the public-facing semantic center name
  2. v3mini = the current internal implementation name for that same semantic center until the repo is renamed

14. Practical Rule

If a phase cannot be summarized in one sentence of the form:

"This phase proves X, and it is closed when Y evidence exists."

then the phase is probably too vague.

15. Production Roadmap Layer

The phase model above is the execution model.

It should not be the only planning view.

V3 also needs a top-down product roadmap so the team can see how narrow phase closures accumulate into a production-capable block system.

The correct planning shape is:

  1. one broad production roadmap describing the major capability gates
  2. one narrow execution-phase ladder describing the next concrete closure step
  3. a clear mapping from the current phase to the broader roadmap position

15.1 Production Target

The production target is not:

  1. a runnable demo
  2. a narrow persistence slice
  3. a calibration-only repo

The production target is:

  1. a semantically correct block system
  2. with real persistence and restart safety
  3. with credible crash-safety boundaries
  4. with operator-usable surfaces
  5. with replicated recovery and fencing behavior that are production-reviewable
  6. with observability, validation, and release-hardening strong enough for real deployment

15.2 Top-Down Roadmap

The broad roadmap should be read as a capability stack:

  1. semantic core correctness
  2. runnable adapter-backed block slice
  3. calibration against selected V2 reality
  4. persistent single-node slice
  5. local data process around the accepted persistence seam
  6. data-sync process for catch-up and rebuild movement
  7. recovery execution process around engine-issued commands
  8. operator-usable single-node product surface
  9. replicated durable slice with honest failover/fencing behavior
  10. production hardening, qualification, and release gate
  11. scale and topology expansion
  12. operations and ecosystem expansion

Each layer should inherit the truth already closed below it.

No layer should be claimed early just because a lower layer demo exists.

15.3 Current Position

The current execution package should be read as:

  1. Phase 04: runnable narrow slice
  2. Phase 05: bootstrap and inspection stabilization
  3. Phase 06: first-pass calibration
  4. Phase 07: first persistence-backed single-node slice

This means the project is currently moving from:

  1. "runnable and calibrated"

to:

  1. "persisted on one node"

It is NOT yet at:

  1. full crash-safety qualification
  2. operator-ready product surface
  3. replicated production rollout
  4. release hardening / GA gate
  5. scale/topology expansion
  6. operations/ecosystem completion

Practical reading rule:

  1. the current delivered closure is recovery semantics and its lower execution boundaries
  2. topology authority, failover selection/promotion policy, and broader cluster governance are explicitly assigned to later phases rather than implied as already done

15.5 Responsibility Table

For scope checking, the later mainline should be read in this short form:

Phase One-line responsibility
P9 move bytes correctly under lineage
P10 execute recovery lifecycle correctly under start/cancel/complete/timeout
P11 ship bounded single-node product surface with no cluster-shape leak
P12 close bounded replicated handoff/rejoin mechanism as mechanism, not topology policy
P13 harden the bounded replicated slice on persistent storage for release criteria
P14 close topology authority and failover policy for who/when/where
P15 expose accepted governance through operator and ecosystem surfaces without creating new authority

Practical rule:

  1. if one task or PR cannot be assigned cleanly to one row, either the task is over-scoped or the phase boundary is still unclear

Delivery-weight note:

  1. P13-P15 should be read as a substantial finalization program, not light finishing work
  2. the expected cost center shifts from semantic-engine invention to control-plane, frontend, and ecosystem integration
  3. the mainline is expected to rely heavily on selected V2 product-muscle porting rather than broad greenfield rewrite
  4. use v3-p13-p15-work-estimate.md as the planning baseline for workload, sequencing, and expected new-code versus port mix

15.4 Planning Rule

Future phase definitions should always answer two questions:

  1. what narrow loop does this phase close
  2. which production-roadmap layer does that closure advance

If a phase closes a local loop but does not clearly move one roadmap layer forward, the phase is probably too internal or too detached from product direction.

16. Execution Institution Model

V3 should not invent lower execution institutions independently from the semantic model.

Instead, they should be derived from:

  1. the model truth domains
  2. the accepted event types
  3. the accepted command boundaries
  4. the visibility contract
  5. the crash/recover contract

This means execution-layer interfaces are not just engineering convenience.

They are the controlled lower institutions that receive delegated authority from the already-accepted V3 semantic route.

16.1 Core Rule

Execution institutions may have:

  1. internal data structures
  2. asynchronous scheduling
  3. batching, retry, and queueing
  4. local progress tracking
  5. narrow local decisions required to execute accepted commands

Execution institutions may NOT have:

  1. authority to redefine semantic meaning
  2. authority to reinterpret accepted commands
  3. authority to publish terminal truth on their own
  4. authority to widen or narrow semantic targets such as targetLSN
  5. authority to turn local progress into system truth without returning through the accepted route

The short rule is:

inside freedom is allowed; outside contract is fixed.

16.2 Knowledge And Authority Split

The semantic route should continue to own:

  1. recovery classification
  2. command intent
  3. target meaning
  4. terminal truth
  5. external visibility rules

Execution institutions may own only:

  1. local execution state
  2. local persistence state
  3. transport/data-transfer state
  4. progress and error detail
  5. local recovery mechanics that do not redefine semantic meaning

16.3 Typical Execution Institutions

Examples of correct lower institutions:

  1. LogicalStorage
  2. DataCommunicator
  3. RecoveryExecutor
  4. ProgressFeed or equivalent trace/progress surface

Expected role boundaries:

  1. LogicalStorage owns local persistence execution, local reopen, and local data recovery details
  2. DataCommunicator owns data transfer, barrier execution, progress reporting, and transport-local retry behavior
  3. RecoveryExecutor owns orchestration of already-decided commands by calling storage and communication institutions
  4. trace/progress surfaces expose evidence but do not become semantic control input

16.3A One Possible Further Split

The list above is not the only acceptable cut.

One possible future split, if the system needs stronger named institutions, is:

  1. IdentityManager
  2. DataManager
  3. CommunicationManager
  4. LBAMap or RecoveryIndex
  5. RecoverProcess

This is a possible partition, not a claim that all five already exist as cleanly separated interfaces today.

Suggested responsibilities:

  1. IdentityManager owns self identity, peer identity, assignment, epoch, endpoint version, and topology context
  2. DataManager owns local read, local write, Write -> lsn, sync, flush, checkpoint, recover, and local durability boundaries
  3. CommunicationManager owns replica connection state, ship/receive, barrier, backpressure, and remote progress
  4. LBAMap or RecoveryIndex owns recovery-oriented mapping knowledge such as which lsn touched which lba
  5. RecoverProcess owns orchestration of engine-issued recovery intent across the other institutions

Suggested prohibitions:

  1. IdentityManager should not own bytes truth or semantic recovery class
  2. DataManager should not own topology, connection policy, or shipping policy
  3. CommunicationManager should not decide recovery class or terminal semantic success
  4. LBAMap should not own identity, connection lifecycle, or semantic authority
  5. RecoverProcess should not invent recovery meaning or rewrite engine-issued targets

One useful consequence of this split is:

  1. read APIs can go directly through DataManager
  2. writes can return lsn directly from DataManager
  3. upper layers can maintain LBAMap knowledge for smarter recovery without pushing that planning logic down into local storage
  4. CommunicationManager can consume lsn-ordered change facts explicitly rather than being hidden behind local write side effects

16.3B Manager Split Rule

The institutions above do not need to become perfectly synchronized at every instant.

Local execution lag is acceptable.

Semantic lag is not.

Allowed:

  1. IdentityManager may accept a newer assignment, epoch, or topology fact before older data-movement goroutines are physically gone
  2. CommunicationManager may still hold an old connection, sender, or queue while cleanup drains
  3. DataManager may still retain local state associated with an older replica path while invalidation is being processed

Not allowed:

  1. an old shipper or old connection continuing to advance current semantic truth after IdentityManager has already made it stale
  2. stale progress, ack, barrier, or "caught up" results being accepted into the live semantic route
  3. cleanup timing differences turning into authority differences

The intended rule is:

  1. execution lag is allowed
  2. authority lag is not

Practical consequence:

  1. once a newer assignment / epoch / endpoint version / session context exists, older execution state must become semantically dead immediately
  2. older goroutines may still run for cleanup, but their outputs must be ignored or rejected at the acceptance boundary
  3. every manager split should be reviewed by asking whether the split changes only cleanup timing, or whether it also changes who still gets to affect system truth

Short form:

old process may still run, but it must already be semantically dead.

16.3C Deliver-Lineage Rule

When a V3 recovery command crosses from semantic truth into execution, it must no longer be lineage-free.

The accepted deliver-side rule is:

  1. the engine chooses recovery class and freezes targetLSN
  2. the adapter or execution boundary binds that recovery work to a fresh sessionID
  3. the execution route carries at least sessionID + epoch + endpointVersion + targetLSN
  4. stale or superseded lineage must be rejected before it can mutate current semantic truth or current replica bytes

This keeps the semantic reducer small without allowing the runtime to become ambiguous during handoff.

Short form:

partial semantic command is acceptable; lineage-free execution is not.

16.4 V2 Muscle Migration Rule

V3 is not a blank-slate rewrite.

The working model is:

  1. V3 defines semantic truth, authority, and boundaries first
  2. compatible V2 execution muscles may then be migrated behind clean V3 seams
  3. migration is filtered by semantic compatibility, not by code reuse convenience alone

This means:

  1. semantic modules from V2 are usually reference-only or rewritten in native V3 form
  2. execution modules from V2 may often be migrated as whole muscles after old semantic coupling is stripped
  3. the phase claim may stay narrow even when the migrated execution muscle is substantial

The purpose is to avoid a renamed V2 that still quietly inherits older truth structures.

17. Interface Review Checklist

When sw proposes a new execution-layer interface or implementation, review it with these questions first.

17.1 Knowledge Boundary

  1. what facts does this interface know
  2. are those facts local execution facts or semantic truth
  3. does it hold any knowledge that should remain in the semantic route instead

17.2 Authority Boundary

  1. what local decisions is this institution allowed to make
  2. does it only execute an accepted command, or does it reinterpret the command
  3. can it accidentally choose recovery class, target meaning, or terminal truth
  4. does it add the required execution lineage before work leaves the semantic route

17.3 Visibility Boundary

  1. what does it expose as trace, progress, or status
  2. can any exposed local state be mistaken for semantic truth
  3. does externally visible success still require the accepted route rather than local completion alone

17.4 Crash And Recover Boundary

  1. what local state must survive restart
  2. what local state may be discarded after crash
  3. after restart, which facts must return through the accepted event/command route before they become system truth

17.5 Migration Boundary

  1. is this a semantic module, adapter/glue module, or execution muscle from V2
  2. if migrated from V2, what old semantic coupling was explicitly removed
  3. is the migration saving throwaway work without re-importing old truth ownership

17.6 Reject Signals

Reject the interface or implementation if any of these appear:

  1. it changes the meaning of an accepted command
  2. it silently widens or narrows targetLSN
  3. it treats local progress as terminal semantic success
  4. it converts trace/projection output into control truth
  5. it carries hidden V2 policy that the V3 route did not explicitly accept
  6. it allows stale callback, stale probe result, or stale mutation traffic to pass without lineage rejection

18. Summary

Yes, V3 should use phases.

But the important rule is:

  1. each phase has one semantic target
  2. each phase has explicit non-goals
  3. each phase has a clear proof gate
  4. each phase is not closed until sw + tester + review all complete the loop
  5. those narrow phase closures should be explicitly mapped to a broader production roadmap
  6. lower execution institutions should be derived from V3 semantic boundaries and reviewed for knowledge/authority correctness
  7. compatible V2 execution muscles may be migrated, but only after semantic filtering and boundary cleanup

That is the safest way to grow V3 without turning it into another open-ended architecture drift.

19. Canonical P14B To Production Plan

This section is the current canonical reading for the remaining mainline work from late P14 to production.

It exists because the earlier coarse reading of P14 and P15 was too small on internal control-plane closure and too optimistic about how much of the production gap could be postponed to operator-facing phases.

Short form:

  1. P14B must close the internal control-plane truth loop
  2. P14A must verify each new mixed route created by that closure
  3. P15 must expose and productize the already-closed internal loop
  4. multi-master HA is not silently included in this bounded mainline plan

19.1 Stable Anchors That Must Not Drift

The following documents remain the stable review anchors while P14B and P15 move quickly:

  1. v3-protocol-truths.md
  2. v3-protocol-claim-and-evidence.md
  3. v3-semantic-constraint-checklist.md
  4. the active phase package and 14A sidecar

Planning may move faster than before. These anchors must not.

Practical rule:

  1. do not widen engine truth just because control-plane work grows
  2. do not import old V2 policy ownership with reused code
  3. do not let heartbeat, transport mood, or projection convenience become semantic authority
  4. do not claim broader product closure than the currently proved route

19.2 Global Target

The remaining mainline target is not just "more topology" or "more operator surface".

The target is:

  1. one bounded single-active-master deployment shape
  2. one bounded topology/control-plane truth loop
  3. one bounded host-consumable block product loop

The control-plane truth loop that must become real is:

heartbeat / observation -> inventory merge and freshness -> stable ClusterSnapshot synthesis -> policy/controller decision -> assignment publication -> adapter / engine convergence -> observed confirmation -> restart recovery of current truth

If this loop is not closed, P15 surfaces have nothing stable to expose.

19.3 Phase Split From Here

The remaining mainline should be read as:

  1. P14B: internal control-plane closure
  2. P14A: verification sidecar over new P14B mixed routes
  3. P15: external control surface, operator/product surface, and frontend/productization

That means:

  1. P14B is still part of P14, not a separate product phase
  2. P15 must not absorb missing internal truth closure
  3. 14A remains proof and regression pressure, not institution ownership

19.4 P14B Overall Responsibility

P14B is closed only when the bounded accepted topology set has:

  1. real observation ingestion
  2. real snapshot synthesis
  3. real durable authority source
  4. real convergence and confirmation rules
  5. real restart-safe current-truth recovery
  6. proof through the real adapter/engine route, not only publisher-local or recording-consumer proof

Bounded deployment assumption for this plan:

  1. one active master / control-plane owner
  2. multiple volumes
  3. per volume, three bounded replica slots on distinct servers
  4. one current primary and two bounded candidates
  5. no multi-master leader election or distributed authority ownership in this plan

19.5 P14B-1 Observation Institution

Target:

  1. turn heartbeat and inventory into a stable ClusterSnapshot producer rather than a test input

Must close:

  1. heartbeat ingestion
  2. freshness / expiry rules
  3. partial and conflicting observation handling
  4. bounded unsupported evidence for incomplete or inconsistent topology input
  5. stable ClusterSnapshot synthesis for the accepted topology set

Engine work:

  1. none by default
  2. engine remains a consumer of already-published identity truth
  3. no new engine truth or projection field unless a later proof shows a real missing read-only output

Primary new-code areas:

  1. core/authority/ for normalized cluster snapshot contract and observation institution boundary
  2. weed/server/ for heartbeat collector and raw master-side wiring
  3. weed/storage/blockvol/v2bridge/ only for bounded source-format adaptation when needed

Port now from V2 (mechanism only):

  1. weed/server/block_heartbeat_loop.go
  2. weed/storage/blockvol/block_heartbeat.go
  3. weed/storage/blockvol/block_heartbeat_proto.go
  4. selected source-format adaptation ideas from weed/storage/blockvol/v2bridge/control.go

Do not port directly:

  1. any heartbeat-to-policy shortcut that directly decides recovery/failover from timing
  2. any volume-local authority mutation path
  3. any old projection/status reuse as control truth

Required proof:

  1. incomplete inventory becomes unsupported evidence, not failover input
  2. stale observation cannot mint fresh authority
  3. one bad or unsupported volume does not block unrelated healthy volume progress

19.6 P14B-2 Durable Authority Institution

Target:

  1. make the current authority line durable and restart-recoverable under the bounded single-owner deployment

Must close:

  1. durable source for current per-volume authority line
  2. restart recovery for controller / publisher current truth
  3. explicit bounded single-owner rule
  4. epoch / endpointVersion continuity after restart
  5. bounded recovery when observed state lags durable authority

Engine work:

  1. none by default
  2. no semantic ownership moves into engine
  3. only read-only evidence additions are acceptable, and only if later proof forces them

Primary new-code areas:

  1. core/authority/ for durable registry / current-line persistence / replay into controller state
  2. weed/server/ for master-side hosting and lifecycle
  3. possibly weed/storage/blockvol/ or adjacent persistence helpers only as storage muscle, not authority owner

Port now from V2 (mechanism only):

  1. weed/server/master_block_registry.go
  2. weed/server/master_block_assignment_queue.go
  3. lifecycle/wiring patterns from weed/server/volume_server_block.go

Do not port directly:

  1. old master or volume code that mutates assignment truth from local convenience state
  2. promote/demote ownership hidden inside volume-local paths
  3. any old registry state treated as semantic authority without explicit filtering

Required proof:

  1. restart does not lose current authority line
  2. stale pre-restart state cannot revive newer authority
  3. bounded single-owner truth remains intact without multi-master assumptions

19.7 P14B-3 Convergence Institution

Target:

  1. make publish-until-observed a real bounded convergence loop instead of a local planning idea

Must close:

  1. desired-state pending / observed / superseded rules
  2. retry / suppression / backoff / dedupe rules
  3. explicit confirmation source for assignment and endpoint moves
  4. stale observation handling that does not thrash authority
  5. bounded authority transition honesty while new identity is converging

Engine work:

  1. preserve the existing ack-gated fence and publication contract
  2. do not add a generic controller loop to adapter/runtime
  3. only tighten bounded-fate handling if a real mixed-route hole appears under 14A review

Primary new-code areas:

  1. core/authority/ for convergence state, confirmation rules, and bounded desired-state lifecycle
  2. weed/server/ for observation inputs and hosting
  3. core/adapter/ only if a new bounded-fate or stale-rejection proof forces a narrow integration fix

Port now from V2 (mechanism only):

  1. selected planning/failover plumbing from weed/server/master_block_plan.go
  2. selected selection/evidence mechanics from weed/server/master_block_failover.go
  3. selected evidence patterns from weed/server/master_block_evidence.go

Do not port directly:

  1. old failover trigger meaning as-is
  2. old policy ownership hidden in master convenience logic
  3. any route where transport/heartbeat timing directly becomes failover truth

Required proof:

  1. published desired state remains until observed or superseded
  2. stale observation cannot churn the current line
  3. authority transition does not overclaim healthy publication
  4. failover and rebalance remain bounded and diagnosable under the accepted topology set

19.8 P14B-4 Full P14 Close

Target:

  1. close one bounded topology/governance product shape on the full accepted topology set

Must close:

  1. multi-volume topology authority under the accepted three-slot pattern
  2. failover and rebalance through real adapter/engine convergence
  3. restart/catch-up/fence/publication behavior across the full bounded route
  4. one final bounded supported-topology statement
  5. one explicit unsupported list

Engine work:

  1. no new policy ownership
  2. no broad semantic rewrite
  3. only bounded fixes that 14A proves are necessary on the mixed routes

Primary proof expectation:

  1. controller-driven route must reach real VolumeReplicaAdapter, not only recording consumers
  2. controller-driven failover/rebalance must remain honest at the publication surface during transition
  3. crash/restart mixed-route proofs must exist for the bounded deployment

19.9 P14A Role During P14B

14A remains the verification sidecar. It should reopen only when a new P14B workstream creates real mixed-route pressure.

Expected 14A reopen themes by workstream:

  1. after Observation Institution:
    • stale / delayed heartbeat
    • partial inventory
    • conflicting observation
    • unsupported evidence honesty
  2. after Durable Authority Institution:
    • stale authority after restart
    • old truth revival
    • bounded single-owner correctness
  3. after Convergence Institution:
    • publish-but-not-observed loops
    • timeout / suppress / dedupe correctness
    • transition publication honesty
    • new silent liveness holes
  4. before Full P14 Close:
    • mixed-route sequence pass across observation, authority, convergence, demotion, and failover overlap

14A must not:

  1. invent new product institutions
  2. widen engine truth just because testing is hard
  3. claim global engine stability

19.10 P15 Responsibility After P14B

P15 starts only after the internal control-plane loop is closed enough to expose.

P15 owns:

  1. external control APIs
  2. operator-facing diagnostics and explanation surfaces
  3. runbook and lifecycle productization
  4. frontend/export protocols such as iSCSI, NVMe/TCP, and CSI
  5. operator packaging and ecosystem integration

P15 does NOT own:

  1. heartbeat truth formation
  2. durable current authority truth
  3. convergence semantics
  4. the internal policy/controller truth loop itself

19.11 V2 Port Matrix For The Mainline Plan

Port now into P14B

These are the highest-value muscles for the reopened P14 mainline:

  1. weed/server/block_heartbeat_loop.go
  2. weed/storage/blockvol/block_heartbeat.go
  3. weed/storage/blockvol/block_heartbeat_proto.go
  4. weed/server/master_block_registry.go
  5. weed/server/master_block_assignment_queue.go
  6. selected mechanism-shaped parts of weed/server/master_block_plan.go
  7. selected mechanism-shaped parts of weed/server/master_block_failover.go
  8. selected evidence patterns from weed/server/master_block_evidence.go
  9. bounded master/volume hosting patterns from weed/server/volume_server_block.go

Port later into P15

  1. weed/storage/blockvol/iscsi/
  2. weed/storage/blockvol/nvme/
  3. weed/storage/blockvol/csi/
  4. weed/storage/blockvol/operator/
  5. weed/storage/blockvol/monitoring/
  6. larger testrunner and scenario-product muscles

Reference only or do-not-port directly

  1. weed/storage/blockvol/promotion.go
  2. old HandleAssignment / promote / demote ownership paths
  3. old engine/orchestrator/registry semantic owners as current truth owners
  4. any V2 route that turns heartbeat timing, local status, or transport convenience directly into authority
  5. any code that would make volume-local runtime mutate assignment truth on its own

19.12 Practical Implementation Order

Use this order unless new evidence forces a re-cut:

  1. P14B-1 Observation Institution
  2. 14A targeted reopen on observation routes
  3. P14B-2 Durable Authority Institution
  4. 14A targeted reopen on restart and durable-truth routes
  5. P14B-3 Convergence Institution
  6. 14A targeted reopen on convergence and publication-honesty routes
  7. P14B-4 Full P14 close package
  8. P15 external/operator/frontend productization

This is intentionally a big-step plan. It is not a license to blur the engine.

The speed rule is:

  1. move fast by porting V2 muscles aggressively
  2. keep engine truth, authority ownership, and semantic constraints stable
  3. prefer one big bounded institution per step over many plumbing-only micro-steps

19.13 One-Sentence Summary

From here to production, the mainline should be read as: