mirror of
https://github.com/seaweedfs/seaweedfs.git
synced 2026-11-15 00:09:00 +01:00
* mount: start the close()/fsync commit deadline after the data upload Flush, Fsync and the truncate path of SetAttr create the 30 s metadataFlushTimeout context on entry and pass it to doFlush, so the clock also runs through FlushData, the upload of the dirty pages. That upload has its own timeouts and retries. When an assign through a stalled filer or a slow volume server takes most of the 30 s, CreateEntry then fails at once with "context deadline exceeded" and close() returns EIO for data that was already stored. The deadline is meant for the commit alone (#10102: "a healthy CreateEntry completes in well under a second"). doFlush now takes the commit timeout and starts the deadline once the data is uploaded. close() still cannot hang on a stuck filer: the commit keeps its 30 s bound. Release and the flush before a rename pass 0, as before (no overall bound, only the per-call filer timeouts). Seen in production on a training cluster: a 30 s stall of one replica's disk, and a filer that stalled for about 30 s, each failed close() with EIO although the upload had succeeded. Tests: close(), fsync() and a truncate below dirty data, each after an assign slower than the deadline (all three fail before this change), and a filer that never answers CreateEntry still fails close() at the deadline. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> * mount: charge the flush commit deadline only for its filer calls Starting the 30 s deadline after the data upload is not enough. flushMetadataToFiler does more than call the filer before it commits: it waits for the handle's locks, reads the file back and uploads it again when its chunks are bloated (maybeMergeChunks), and uploads a manifest once enough chunks have built up (MaybeManifestize). None of that takes the context. When it outlasts the deadline, CreateEntry again fails at once with "context deadline exceeded", and close() or fsync() returns an error for data that was stored. The deadline becomes a budget, commitBudget, charged only while a filer call of the commit runs: CreateEntry, and the read of a changed hard link before it. The attempts of one flush share it, and a flush is not retried once it is spent, so a stuck filer still fails close() after 30 s. Release, the flush before a rename and the async flush pass no budget, as before. Seen in production: the merge of a 1.8 MiB sqlite file with 183 chunks took 32 s because one chunk's read first tried a volume server that was down, and the commit failed 32 microseconds after the merge finished. Tests: a flush whose manifest upload is slower than the deadline commits (it fails without this change), and the filer calls of one flush share the budget. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com> * mount: give the stalled-lookup refusal test the new doFlush argument TestContentFlushRefusalWithStalledLookup came in from master after this branch changed doFlush's signature, so the merged package did not build. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> --------- Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com> Co-authored-by: Chris Lu <chrislusf@users.noreply.github.com>