- phase-13.md: CP13-1 through CP13-6 accepted, CP13-7 active - phase-13-log.md: full technical + delivery packs for CP13-2..CP13-7 - phase-13-cp4-state-eligibility.md: refined barrier behavior table (Disconnected/Degraded as recovery entry points, not eligibility) - phase-12.md: minor cross-reference updates - Older phase docs: minor wording alignment - Design docs: V2 development plan and completion overview updated Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
317 lines
11 KiB
Markdown
317 lines
11 KiB
Markdown
# V2 Product Completion Overview
|
|
|
|
Date: 2026-03-31
|
|
Status: active
|
|
Purpose: provide one product-level overview of current V2 engineering completion, V1 reuse strategy, and the roadmap from the accepted candidate path to a production-ready block engine
|
|
|
|
## Why This Document Exists
|
|
|
|
The project now has enough accepted V2 algorithm, engine, and hardening evidence that the next question is no longer only:
|
|
|
|
1. is the protocol correct
|
|
|
|
It is also:
|
|
|
|
1. how complete is the product path
|
|
2. which parts are already strong
|
|
3. which parts can reuse V1 engineering
|
|
4. which parts still require major implementation work
|
|
5. which future phases actually move product completion
|
|
|
|
This document is the product-completion view.
|
|
|
|
It complements:
|
|
|
|
1. `v2-protocol-truths.md` for accepted semantics
|
|
2. `../docs/archive/design/v2-production-roadmap.md` for the older roadmap ladder
|
|
3. `../.private/phase/phase-08.md` for current phase contract
|
|
|
|
## Current Position
|
|
|
|
The accepted first candidate path is:
|
|
|
|
1. `RF=2`
|
|
2. `sync_all`
|
|
3. existing master / volume-server heartbeat path
|
|
4. V2 engine owns recovery policy
|
|
5. `v2bridge` translates real storage/control truth
|
|
6. `blockvol` remains the execution backend
|
|
|
|
This means the project is no longer at "algorithm only".
|
|
It already has:
|
|
|
|
1. accepted protocol truths
|
|
2. accepted engine execution closure
|
|
3. accepted hardening replay on a real integrated path
|
|
4. one bounded candidate statement
|
|
|
|
## Engineering Completion Snapshot
|
|
|
|
These levels are rough engineering estimates, not exact percentages.
|
|
|
|
| Area | Current level | Notes |
|
|
|------|---------------|-------|
|
|
| Algorithm / protocol truths | Strong | Core V2 semantics are accepted and should remain stable unless contradicted by live evidence. |
|
|
| Simulator / prototype evidence | Strong | Main failure classes and protocol boundaries are already well-exercised. |
|
|
| Engine recovery core | Strong | Sender/session/orchestrator/driver/executor are substantially implemented. |
|
|
| Weed bridge integration | Strong | Reader / pinner / control / executor are real and tested on the chosen path. |
|
|
| Integrated candidate path | Strong on chosen path | Backend, control-plane, and selected product surfaces are now accepted on one bounded chosen path. |
|
|
| Runtime ownership inside live server loop | Strong on chosen path | Accepted chosen-path execution/control ownership exists; later work is restart/disturbance hardening, not first-closure rebinding. |
|
|
| Production-grade data transfer | Strong on chosen path | `TransferFullBase` and `TransferSnapshot` execution closure are accepted on the chosen path; later work is hardening. |
|
|
| Truncation / replica-ahead execution | Strong on chosen path | `TruncateWAL` narrow chosen-path closure is accepted; later work is hardening/planning improvement. |
|
|
| End-to-end control-plane closure | Strong on chosen path | `Phase 10` accepted bounded end-to-end control-path closure on the chosen path. |
|
|
| Product surfaces (`CSI`, `NVMe`, `iSCSI`, snapshot productization) | Strong on chosen path | `Phase 11` accepted bounded product-surface rebinding on the chosen path. |
|
|
| Production hardening / ops | Partial | `Phase 12` is now the next active stage. |
|
|
|
|
## Reuse Strategy
|
|
|
|
Use this rule:
|
|
|
|
1. if a component decides truth, V2 must own it
|
|
2. if a component consumes truth, V1 engineering can often be reused
|
|
|
|
### V2-owned semantics
|
|
|
|
These should not inherit V1 semantics casually:
|
|
|
|
1. recovery choice: `zero_gap` / `catchup` / `needs_rebuild`
|
|
2. sender/session ownership and fencing
|
|
3. stable `ReplicaID` and stale-authority rejection
|
|
4. committed/checkpoint interpretation
|
|
5. rebuild-source choice and recovery outcome meaning
|
|
|
|
### V1 engineering that is usually reusable
|
|
|
|
These are implementation/reality layers, not protocol truth:
|
|
|
|
1. `blockvol` storage runtime
|
|
2. WAL / flusher / checkpoint machinery
|
|
3. real assignment receive/apply path
|
|
4. front-end adapters such as `NVMe` / `iSCSI`
|
|
5. much of `CSI` lifecycle integration
|
|
6. monitoring / metrics / test harness infrastructure
|
|
|
|
### Reuse with explicit bounds
|
|
|
|
These can reuse implementation, but their semantic placement must remain V2-owned:
|
|
|
|
1. snapshot export / checkpoint plumbing
|
|
2. rebuild transport / extent read path
|
|
3. master/heartbeat/control delivery path
|
|
|
|
## Module Treatment Overview
|
|
|
|
| Module area | Current treatment | Near-term plan |
|
|
|-------------|-------------------|----------------|
|
|
| Recovery engine | V2-owned | Keep semantics stable and focus next on restart/disturbance hardening. |
|
|
| `v2bridge` | V2 boundary adapter | Chosen-path execution closure is accepted; later work is hardening without leaking policy downward. |
|
|
| `blockvol` WAL/flusher/runtime | Reuse reality | Reuse implementation, but do not let V1 replication semantics redefine V2 truth. |
|
|
| Snapshot capability | Reuse implementation, V2-owned semantics | Rebinding is accepted on the chosen path; later work is hardening. |
|
|
| `CSI` | Accepted product surface on chosen path | Keep the bounded contract stable and harden under disturbance. |
|
|
| `NVMe` / `iSCSI` | Accepted front-end adapters on chosen path | Keep publication/address truth stable and harden runtime behavior. |
|
|
| Rebuild server / transfer mechanisms | Reuse with redesign boundary | Chosen-path execution closure is accepted; later work is disturbance hardening. |
|
|
| Control plane | Reuse existing path | Bounded chosen-path closure is accepted; later work is restart/disturbance hardening. |
|
|
|
|
## What The Candidate Path Already Proves
|
|
|
|
For the chosen `RF=2 sync_all` path, the project can already claim:
|
|
|
|
1. stable remote identity across address change when `ServerID` is present
|
|
2. stale epoch/session fencing through the integrated path
|
|
3. real catch-up one-chain closure on the chosen path
|
|
4. rebuild control/execution chain proven on the chosen path
|
|
- chosen-path execution closure accepted in `Phase 09`
|
|
- later work is restart/disturbance/perf hardening rather than first-path closure
|
|
5. replay of accepted failure classes on the unified live path
|
|
6. one real failover / reassignment cycle
|
|
7. one true simultaneous-overlap retention safety proof
|
|
8. committed/checkpoint separation accepted for this candidate path:
|
|
- `CommittedLSN = WALHeadLSN`
|
|
- `CheckpointLSN` remains the durable base-image boundary
|
|
|
|
## What Is Still Missing For Product Completion
|
|
|
|
The biggest remaining product-completion gaps are now production-hardening gaps:
|
|
|
|
1. restart / recovery disturbance hardening
|
|
- accepted chosen-path behavior must remain correct under restart, rejoin, and repeated failover
|
|
2. long-run / soak stability
|
|
- accepted behavior must remain stable across repeated cycles and longer-running operation
|
|
3. operational diagnosability
|
|
- blockers, symptoms, and operator-visible diagnosis quality must be explicit
|
|
4. performance floor and rollout gates
|
|
- production claims need bounded floor numbers and explicit rollout criteria
|
|
|
|
## Recommended Completion Roadmap
|
|
|
|
### Stage 1: Finish Phase 08 cleanly
|
|
|
|
Target:
|
|
|
|
1. close candidate-path judgment with explicit bounds and package it cleanly inside `Phase 08 P4`
|
|
|
|
Main output:
|
|
|
|
1. one accepted candidate package for the chosen path
|
|
|
|
### Stage 2: Phase 09 Production Execution Closure
|
|
|
|
Target:
|
|
|
|
1. turn validation-grade execution into production-grade execution
|
|
|
|
Main work:
|
|
|
|
1. real `TransferFullBase`
|
|
2. real `TransferSnapshot`
|
|
3. real `TruncateWAL`
|
|
4. stronger runtime ownership of recovery execution
|
|
|
|
Why it matters:
|
|
|
|
This is the largest remaining engineering block between "candidate-safe-with-bounds" and a serious product path.
|
|
|
|
### Stage 3: Phase 10 Real Control-Plane Closure
|
|
|
|
Target:
|
|
|
|
1. strengthen from accepted assignment-entry closure to fuller end-to-end control-path closure
|
|
|
|
Status:
|
|
|
|
1. accepted and closed on the chosen path
|
|
|
|
Main work:
|
|
|
|
1. heartbeat/gRPC-level proof
|
|
2. stronger control/result convergence
|
|
3. better identity completeness for local and remote server roles
|
|
|
|
### Stage 4: Phase 11 Product Surface Rebinding
|
|
|
|
Target:
|
|
|
|
1. connect product-facing surfaces to the V2-backed block path
|
|
|
|
Status:
|
|
|
|
1. accepted and closed on the chosen path
|
|
|
|
Candidate areas:
|
|
|
|
1. snapshot product path
|
|
2. `CSI`
|
|
3. `NVMe`
|
|
4. `iSCSI`
|
|
|
|
Recommended first cut:
|
|
|
|
1. snapshot product path first
|
|
2. `CSI` and `NVMe` / `iSCSI` after one bounded product-visible surface is already accepted
|
|
|
|
Suggested order inside `Phase 11`:
|
|
|
|
1. `P1` snapshot product path
|
|
2. `P2` `CSI`
|
|
3. `P3` `NVMe` / `iSCSI`
|
|
4. `P4` broader residual workflow closure if still required
|
|
|
|
Rule:
|
|
|
|
Do this after the backend engine/runtime path is strong enough, not before.
|
|
|
|
### Stage 5: Phase 12 Production Hardening
|
|
|
|
Target:
|
|
|
|
1. move from candidate-safe to production-safe
|
|
|
|
Status:
|
|
|
|
1. accepted and closed on the bounded chosen path
|
|
|
|
Main work:
|
|
|
|
1. soak / restart / repeated failover
|
|
2. operational diagnosis quality
|
|
3. performance floor and cost characterization
|
|
4. explicit production blockers / rollout gates
|
|
|
|
### Stage 6: Post-`Phase 12` Productionization Program
|
|
|
|
Target:
|
|
|
|
1. turn the accepted `Phase 12` chosen path into a bounded first-launch product envelope without reopening protocol discovery
|
|
|
|
Status:
|
|
|
|
1. next active stage after `Phase 12`
|
|
|
|
Main work:
|
|
|
|
1. freeze the first supported launch envelope from accepted `P1`-`P4` evidence
|
|
2. define a limited internal pilot package with explicit preflight, success, and stop conditions
|
|
3. run incident-driven hardening with explicit classification:
|
|
- config / environment issue
|
|
- known exclusion
|
|
- true product bug
|
|
4. perform controlled rollout review only within the named supported envelope
|
|
|
|
Rules:
|
|
|
|
1. this is not `Phase 12 P5`
|
|
2. pilot success is not generic production proof
|
|
3. missing evidence remains an explicit launch constraint until cleared, especially:
|
|
- failover-under-load performance
|
|
- hours/days soak under load
|
|
- `RF>2`
|
|
- broad transport matrix
|
|
- full gRPC-stream integration evidence
|
|
|
|
## Completion Gates
|
|
|
|
The most important gates from here are:
|
|
|
|
1. execution gate
|
|
- validation-grade transfer/truncation must become production-grade
|
|
2. runtime ownership gate
|
|
- V2 recovery must be a stronger live runtime path, not only a bounded tested path
|
|
3. control-plane gate
|
|
- stronger end-to-end control delivery proof
|
|
4. product-surface gate
|
|
- front-end surfaces should only rebind after backend correctness is strong enough
|
|
5. production-hardening gate
|
|
- restart, soak, diagnosis, and repeated disturbance must be acceptable
|
|
6. productionization gate
|
|
- first launch envelope, pilot discipline, incident routing, and controlled rollout review must be explicit
|
|
|
|
## Near-Term Planning Guidance
|
|
|
|
If the goal is to maximize product completion efficiently:
|
|
|
|
1. do not reopen accepted execution, control-plane, or product-surface semantics casually
|
|
2. finish `Phase 12` hardening cleanly
|
|
3. then freeze the first supported launch envelope
|
|
4. then run a limited internal pilot
|
|
5. then widen only through explicit incident review and rollout-gate review
|
|
|
|
In short:
|
|
|
|
1. chosen-path closure first
|
|
2. production hardening second
|
|
3. bounded productionization third
|
|
|
|
## Short Summary
|
|
|
|
The V2 line is already beyond "algorithm only".
|
|
It has an accepted bounded chosen path through backend, control-plane, selected product surfaces, and `Phase 12` hardening.
|
|
|
|
But the remaining work is still substantial, and it is mostly engineering work:
|
|
|
|
1. freeze the first supported launch envelope from accepted evidence
|
|
2. run a limited internal pilot with explicit stop conditions
|
|
3. harden from incidents without silently broadening scope
|
|
4. perform controlled rollout review inside a bounded launch envelope
|
|
|
|
That is the practical path from the current production-safe chosen path to a bounded first-launch block product.
|