Engine execution layer for V2 replication protocol: - RebuildInstaller: full state handoff (dirty map, WAL, superblock, flusher) - TruncateToLSN: exact safety predicate (checkpointLSN == truncateLSN), ErrTruncationUnsafe escalation to NeedsRebuild - SyncReceiverProgress: unconditional Store for post-rebuild alignment - V2StatusSnapshot: CommittedLSN = nextLSN-1 for sync_all V2 bridge real I/O executors: - TransferFullBase: TCP streaming + RebuildInstaller + second catch-up - TransferSnapshot: SHA-256 verified streaming to disk - TruncateWAL: ErrTruncationUnsafe detection + escalation - StreamWALEntries: rebuild-mode TCP apply Engine executor interfaces: - CatchUpIO.TruncateWAL, RebuildIO.TransferFullBase returns achievedLSN - CatchUpExecutor truncation-only skip, NeedsRebuild escalation - RebuildExecutor uses achievedLSN for progress tracking Design docs reorganized: superseded planning docs removed, protocol truths and closure map added. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
365 lines
16 KiB
Markdown
365 lines
16 KiB
Markdown
# V2 Phase Development Plan
|
|
|
|
Date: 2026-04-02
|
|
Status: active
|
|
Purpose: define the execution-oriented phase plan after the current candidate-path work, with explicit module status and target phase ownership
|
|
|
|
## Why This Document Exists
|
|
|
|
The project now needs a development plan that is:
|
|
|
|
1. phase-oriented
|
|
2. execution-oriented
|
|
3. large enough to avoid overhead-heavy micro-slices
|
|
4. explicit about which module belongs to which future phase
|
|
|
|
This document is the planning bridge between:
|
|
|
|
1. `v2-product-completion-overview.md`
|
|
2. `../.private/phase/phase-08.md`
|
|
3. future implementation phases
|
|
|
|
## Planning Rules
|
|
|
|
Use these rules for all later phases:
|
|
|
|
1. one phase should close one meaningful product/engineering outcome
|
|
2. every phase must have a clear delivery object and a clear closed-loop validation mechanism
|
|
3. every slice inside a phase should also name:
|
|
- what is delivered
|
|
- what loop is proven closed
|
|
- what reject shapes remain insufficient
|
|
4. phases should prefer real code/test/evidence over wording-only progress
|
|
5. later phases may reuse V1 engineering reality, but must not inherit V1 recovery semantics as truth
|
|
6. a phase is too small if it does not move the overall product-completion state clearly
|
|
|
|
## Current Baseline
|
|
|
|
Current accepted path through `Phase 09`:
|
|
|
|
1. protocol/algo truth set is strong
|
|
2. engine recovery core is strong
|
|
3. real control delivery exists on the chosen path
|
|
4. real one-chain catch-up and rebuild closure exist on the chosen path
|
|
5. production-grade execution closure is accepted on the chosen path:
|
|
- real `TransferFullBase`
|
|
- real `TransferSnapshot`
|
|
- real `TruncateWAL`
|
|
- stronger live runtime ownership on the volume-server path
|
|
6. unified hardening validation exists on the chosen path
|
|
7. one bounded accepted path exists for:
|
|
- `RF=2`
|
|
- `sync_all`
|
|
- existing master / volume-server heartbeat path
|
|
|
|
Phase-accounting note:
|
|
|
|
1. `Phase 08` is closed
|
|
2. `Phase 09` is also closed
|
|
3. this roadmap should now be read from the post-`Phase 09` state, not the post-`Phase 08` state
|
|
|
|
This means the next phases should focus mainly on:
|
|
|
|
1. stronger control-plane closure
|
|
2. later product-surface rebinding
|
|
3. production hardening
|
|
4. bounded cleanup of low-severity residuals without reopening accepted execution semantics
|
|
|
|
## Phase Roadmap
|
|
|
|
### Phase 09: Production Execution Closure
|
|
|
|
Goal:
|
|
|
|
1. turn validation-grade backend execution into production-grade backend execution
|
|
|
|
Must prove:
|
|
|
|
1. full-base rebuild performs real data transfer
|
|
2. snapshot rebuild performs real image transfer
|
|
3. replica-ahead path is physically executable, not only detected
|
|
4. runtime execution ownership is stronger than the current bounded candidate path
|
|
|
|
Typical outputs:
|
|
|
|
1. real `TransferFullBase`
|
|
2. real `TransferSnapshot`
|
|
3. real `TruncateWAL`
|
|
4. stronger executor/runtime integration in the live volume-server path
|
|
|
|
Verification mechanism:
|
|
|
|
1. one-chain execution tests on real backend paths
|
|
2. cleanup assertions after success/failure/cancel
|
|
3. focused adversarial tests for truncation and rebuild execution
|
|
|
|
Workload:
|
|
|
|
1. large
|
|
2. this is likely the single biggest remaining engineering phase
|
|
|
|
Status:
|
|
|
|
1. complete
|
|
2. accepted closeout exists in `../.private/phase/phase-09.md`
|
|
|
|
### Phase 10: Real Control-Plane Closure
|
|
|
|
Goal:
|
|
|
|
1. strengthen from accepted assignment-entry closure to fuller end-to-end control-plane closure
|
|
|
|
Why this is next:
|
|
|
|
1. `Phase 09` already closed the main backend execution gaps
|
|
2. the most important remaining product risk is no longer storage execution itself
|
|
3. it is now control-path completeness:
|
|
- heartbeat / gRPC delivery
|
|
- reassignment / result convergence
|
|
- cleaner local identity than transport-shaped `listenAddr`
|
|
4. `Phase 10` can also absorb bounded low-severity cleanup discovered during `Phase 09` if it is directly relevant to live control/runtime ownership
|
|
|
|
Current accepted progress inside `Phase 10`:
|
|
|
|
1. `P1` accepted:
|
|
- stable identity and control-truth closure on the chosen block assignment wire
|
|
2. `P2` accepted:
|
|
- reassignment/result convergence through the accepted volume-server-side chosen-path ingress
|
|
3. `P3` accepted:
|
|
- bounded repeated-assignment / idempotence cleanup on the chosen live path
|
|
4. `P4` accepted:
|
|
- master-driven heartbeat / gRPC control-loop closure on the chosen path
|
|
5. `Phase 10` is now closed:
|
|
- bounded end-to-end control-plane closure for the chosen path is accepted
|
|
|
|
Must prove:
|
|
|
|
1. heartbeat/gRPC-level delivery is real for the chosen path
|
|
2. failover / reassignment state converges through the real control path
|
|
3. local and remote identity are consistent enough for product use
|
|
|
|
Typical outputs:
|
|
|
|
1. stronger heartbeat/gRPC delivery proof
|
|
2. stronger result/reporting convergence
|
|
3. cleaner local identity than transport-shaped `listenAddr`
|
|
|
|
Verification mechanism:
|
|
|
|
1. real failover/reassignment tests at the fuller control-plane level
|
|
2. identity/fencing assertions through the end-to-end path
|
|
|
|
Suggested first targets:
|
|
|
|
1. keep accepted `Phase 10` control-plane closure closed
|
|
2. start `Phase 11` with one bounded product-surface rebinding slice
|
|
3. prefer selected surface proofs over broad surface explosion
|
|
4. keep any residual control-path cleanup narrow; do not reopen accepted `Phase 10` closure casually
|
|
|
|
Workload:
|
|
|
|
1. medium-large
|
|
|
|
### Phase 11: Product Surface Rebinding
|
|
|
|
Goal:
|
|
|
|
1. bind product-facing surfaces onto the V2-backed block path after backend closure is strong enough
|
|
|
|
Must prove:
|
|
|
|
1. the V2-backed backend can support selected product surfaces without semantic drift
|
|
2. reuse of V1 surfaces does not reintroduce V1 recovery truth
|
|
|
|
Candidate areas:
|
|
|
|
1. snapshot product path
|
|
2. `CSI`
|
|
3. `NVMe`
|
|
4. `iSCSI`
|
|
|
|
Recommended first slice:
|
|
|
|
1. start with bounded `snapshot product path` rebinding
|
|
2. defer `CSI` and `NVMe` / `iSCSI` until one simpler product-visible surface is already accepted
|
|
|
|
Suggested slice order:
|
|
|
|
1. `P1` snapshot product-path rebinding
|
|
2. `P2` `CSI` rebinding
|
|
3. `P3` `NVMe` / `iSCSI` front-end rebinding
|
|
4. `P4` broader workflow closure such as snapshot restore/clone if still needed
|
|
|
|
Verification mechanism:
|
|
|
|
1. selected surface integration tests
|
|
2. product-surface contract checks
|
|
3. no-overclaim review that the surface does not imply unsupported backend capability
|
|
|
|
Workload:
|
|
|
|
1. medium-large
|
|
2. can be split by product surface if needed, but only after backend closure is strong
|
|
|
|
### Phase 12: Production Hardening
|
|
|
|
Goal:
|
|
|
|
1. move from candidate-safe to production-safe
|
|
|
|
Must prove:
|
|
|
|
1. restart/recovery stability under repeated disturbance
|
|
2. long-run/soak viability
|
|
3. operational diagnosability
|
|
4. acceptable production blockers list or production-ready gate
|
|
|
|
Verification mechanism:
|
|
|
|
1. soak/adversarial runs
|
|
2. failover/restart under disturbance
|
|
3. runbook/debug validation
|
|
|
|
Workload:
|
|
|
|
1. large
|
|
|
|
Recommended initial planning cut:
|
|
|
|
1. treat `P0` as hardening-plan freeze
|
|
2. first hardening slice should likely target restart / recovery disturbance before soak or perf
|
|
|
|
Current slice order:
|
|
|
|
1. `P0` hardening-plan freeze
|
|
2. `P1` restart / recovery disturbance hardening
|
|
3. `P2` soak / long-run stability hardening
|
|
4. `P3` diagnosability / blocker accounting / runbook hardening
|
|
5. `P4` performance floor / rollout-gate hardening
|
|
|
|
Slice delivery / closed-loop bar:
|
|
|
|
1. every `Phase 12` slice must end with:
|
|
- one bounded delivery object
|
|
- one bounded closed-loop validation object
|
|
- one explicit no-overclaim boundary
|
|
2. “tests exist” is not enough:
|
|
- the tests must close the loop from disturbance/input to visible accepted truth
|
|
3. “code changed” is also not required:
|
|
- a hardening slice may legitimately close by proving existing production code is already correct under the targeted disturbance class
|
|
|
|
Current status:
|
|
|
|
1. `P0` accepted:
|
|
- hardening object frozen as the accepted chosen path from `Phase 09` + `Phase 10` + `Phase 11`
|
|
- slice order frozen as `P1` / `P2` / `P3` / `P4`
|
|
- evidence ladder frozen as disturbance correctness, soak, diagnosability, then perf/rollout gates
|
|
2. `P1` accepted:
|
|
- acceptance object = correctness under restart/disturbance on the chosen path
|
|
- not soak, not diagnosability, not performance, not rollout readiness
|
|
3. `P2` accepted:
|
|
- acceptance object = bounded soak / long-run stability on the chosen path
|
|
- repeated-cycle coherence and bounded runtime-state hygiene are accepted inside a bounded test envelope
|
|
4. `P3` accepted:
|
|
- acceptance object = bounded diagnosability / blocker accounting / runbook hardening on the chosen path
|
|
- bounded operator-visible diagnosis surfaces and finite blocker accounting are accepted
|
|
5. `P4` active:
|
|
- acceptance object = bounded performance floor / rollout-gate hardening on the chosen path
|
|
- not broad rollout readiness beyond the named launch envelope
|
|
|
|
Current `P4` first delivery shape:
|
|
|
|
1. proof-first hardening slice with explicit measured floor and launch-gate artifacts
|
|
2. one bounded performance package:
|
|
- named workload envelope
|
|
- repeatable measurement harness
|
|
- explicit floor values
|
|
3. one explicit rollout-gate artifact:
|
|
- finite supported launch envelope
|
|
- cleared blockers/gates
|
|
- remaining blockers/gates
|
|
4. current evidence shape:
|
|
- measured floor values are tied to one named accepted workload envelope
|
|
- cost/resource trade-offs are explicit
|
|
- rollout discussion is bounded by an explicit finite gate package
|
|
5. current reuse boundary:
|
|
- accepted chosen-path runtime/control/product surfaces remain stable unless perf-floor work exposes a real bug or measurement gap
|
|
- focused benchmarks/tests and bounded launch-gate artifacts carry the main delivery burden
|
|
|
|
Closed-loop expectation for `P4` review:
|
|
|
|
1. one bounded workload envelope runs on the accepted chosen path
|
|
2. measured floor values and cost characteristics are explicit
|
|
3. launch claims map back to accepted prior slices plus the measured envelope
|
|
4. remaining rollout blockers are explicit and finite
|
|
5. claims remain bounded to measured floor / named launch envelope only
|
|
|
|
After `Phase 12`:
|
|
|
|
1. move to a productionization program, not more protocol-discovery phases
|
|
2. freeze production blockers and the supported launch envelope
|
|
3. run a limited internal pilot with incident-driven hardening
|
|
4. perform controlled rollout only after explicit launch-gate review
|
|
|
|
## Module Status Map
|
|
|
|
|
|
| Module area | Current status | Current owner phase | Next target phase | Notes |
|
|
| ------------------------------------------------------------- | ---------------------------- | ------------------------ | ----------------- | ------------------------------------------------------------------------------------------ |
|
|
| `sw-block/engine/replication` core FSM/orchestrator/driver | Strong | `Phase 09` accepted | `Phase 10-12` | Main later work is control-plane/runtime integration and hardening, not new core semantics. |
|
|
| Engine executor real I/O boundary (`CatchUpIO` / `RebuildIO`) | Strong on chosen path | `Phase 09` accepted | `Phase 10/12` | Keep the boundary stable; later work is orchestration/control proof and hardening. |
|
|
| `weed/storage/blockvol/v2bridge/control.go` | Strong on chosen path | `Phase 08/09/10` accepted | `Phase 12` | Chosen-path control mapping is accepted; later work is hardening, not new mapping semantics. |
|
|
| `weed/storage/blockvol/v2bridge/reader.go` | Strong | `Phase 09` accepted | `Phase 12` | Mostly stable; later work is verification/hardening, not new semantics. |
|
|
| `weed/storage/blockvol/v2bridge/pinner.go` | Strong | `Phase 09` accepted | `Phase 12` | Retention safety proven; later work is hardening under disturbance. |
|
|
| `weed/storage/blockvol/v2bridge/executor.go` WAL scan | Strong | `Phase 09` accepted | `Phase 12` | Real execution path closed on chosen path; later work is hardening. |
|
|
| `v2bridge` `TransferFullBase` | Strong on chosen path | `Phase 09 P1` accepted | `Phase 12` | Execution closure accepted; do not reopen casually. |
|
|
| `v2bridge` `TransferSnapshot` | Strong on chosen path | `Phase 09 P2` accepted | `Phase 12` | Execution closure accepted; do not reopen casually. |
|
|
| `v2bridge` `TruncateWAL` | Strong on chosen path | `Phase 09 P3` accepted | `Phase 12` | Narrow Option A contract accepted; later work is hardening/planning improvement. |
|
|
| `weed/server/volume_server_block.go` V2 assignment intake | Strong on chosen path | `Phase 10 P4` accepted | `Phase 11/12` | VS-side ingress, convergence, idempotence, and bounded master-driven closure are accepted; later work is product-surface integration and hardening. |
|
|
| `weed/server/block_recovery.go` live runtime ownership | Strong on chosen path | `Phase 09/10` accepted | `Phase 11/12` | Serialized ownership and bounded control-plane integration are accepted; later work is product-surface integration and hardening. |
|
|
| `blockvol` WAL/flusher/checkpoint runtime | Reuse reality | Existing production code | `Phase 12` | Reuse implementation; later work is disturbance/restart hardening. |
|
|
| `blockvol` rebuild transport/server reality | Reuse with redesign boundary | Existing production code | `Phase 12` | Bounded chosen-path integration is accepted; later work is hardening under disturbance. |
|
|
| local server identity (`localServerID`) | Strong on chosen path | `Phase 10 P1` accepted | `Phase 12` | Canonical `volumeServerId` now backs chosen-path local identity; later work is hardening only. |
|
|
| Snapshot product path | Strong on chosen path | `Phase 11` accepted | `Phase 12` | Product-visible snapshot create/list/delete closure and restore workflow closure are accepted; later work is hardening, not rebinding. |
|
|
| `CSI` integration | Strong on chosen path | `Phase 11` accepted | `Phase 12` | Bounded controller/node lifecycle rebinding accepted; later work is hardening. |
|
|
| `NVMe` / `iSCSI` front-ends | Strong on chosen path | `Phase 11` accepted | `Phase 12` | Publication/address truth rebinding accepted; later work is runtime/perf hardening. |
|
|
| Testrunner / infra / metrics | Strong support layer | existing | `Phase 11-12` | Reuse to validate later product-surface and hardening phases. |
|
|
|
|
|
|
## Completion-State Targets
|
|
|
|
Use these rough targets to judge whether a phase is moving the product meaningfully.
|
|
|
|
|
|
| Phase | Expected completion move |
|
|
| ---------- | ----------------------------------------------------------------------------- |
|
|
| `Phase 09` | from validation-grade backend execution to accepted execution closure on the chosen path |
|
|
| `Phase 10` | from bounded control-entry proof to stronger end-to-end control-plane closure |
|
|
| `Phase 11` | from backend-ready path to selected product-surface readiness |
|
|
| `Phase 12` | from candidate-safe to production-safe |
|
|
|
|
|
|
## Near-Term Execution Direction
|
|
|
|
If the goal is to maximize product completion efficiently, the recommended order is:
|
|
|
|
1. keep `Phase 09` closed and do not reopen accepted execution semantics casually
|
|
2. keep `Phase 10` closed and do not reopen accepted bounded control-plane closure casually
|
|
3. move next to `Phase 11` product surface rebinding
|
|
4. then `Phase 12` production hardening
|
|
|
|
The most important near-term engineering weight should now go to `Phase 12`.
|
|
|
|
## Short Summary
|
|
|
|
The V2 line now has accepted execution closure on one bounded chosen path.
|
|
The next development plan should treat later work as control/product completion phases, not more protocol discovery.
|
|
|
|
The main heavy engineering work still ahead is:
|
|
|
|
1. stronger end-to-end control-plane closure
|
|
2. later product-surface rebinding
|
|
3. production hardening
|
|
4. bounded cleanup of residual operational rough edges without reopening accepted semantics
|
|
|